跳到内容

水资源工程

水资源工程服务

lovebet爱博体育app提供广泛的水资源工程服务,重点是地表水水文领域, 排水分析与管理. lovebet爱博体育app员工致力于负责新墨西哥州水资源基础设施的规划和工程设计. 除了, 同时,lovebet爱博体育app还为水利工程项目提供包括规划设计在内的施工阶段投标服务.

riograndepic

泛滥平原分析 & 映射

lovebet爱博体育app routinely performs floodplain analysis and floodplain mapping projects. lovebet爱博体育app also prepares Conditional Letter of Map Revisions (CLOMR’s) and Letter of Map Revisions (LOMR’s) with FEMA.

watertankpic

水基础设施项目

lovebet爱博体育app has designed and administered water infrastructure projects including wells, 储罐, 增压泵站, water transmission and distribution lines for domestic water systems.

废水处理

废水的经验

The lovebet爱博体育app team offers over 25 years of experience in water/wastewater projects. This gives us a solid track record with the Environmental Protection Agency (EPA), and the 新墨西哥 Environment Department (NMED), in permitting and meeting agency rules and regulations.

The following list highlights several of our other capabilities in the area of water resources engineering:

  • 地表水水文
  • 液压 & 水文建模
  • 泛滥平原的调查 & 映射
  • 排水管理总体计划
  • 侵蚀 & 泥沙控制计划
  • 水 & 废水处理设施
  • 灌溉结构 & 通道的改进
  • 水权 & 污水排放
  • 允许应用程序 & 文档

The lovebet爱博体育app team offers over 25 years of experience in water/wastewater projects. This gives us a solid track record with the Environmental Protection Agency (EPA), and the 新墨西哥 Environment Department (NMED), in permitting and meeting agency rules and regulations.The experience of our team in the wastewater field include facility master planning, 设施设计, 建筑的观察, 建设行政, 环境评估, 操作员培训, 我/我分析, 用户速率研究, 启动服务, 操作手册, 工业预处理程序, 植物的性能故障排除, 项目性能, 过程仪表, 和过程控制. lovebet爱博体育app’s experience in the area of 水资源工程 includes drainage, 排水系统设计, 水系统设计, 以及社区总体规划. 我们的水/废水处理团队设计和管理了超过1亿美元的水/废水基础设施的建设. 以下是几个突出我们项目组在水资源领域专业设计和技术能力的项目:

中央惩教设施及水务 & 污水主要升级

loveBet爱博体育下载这个1.由于资金期限和与现场现有水井相关的水质问题,100万美元的项目在3-4周内设计完成. lovebet爱博体育app设计了10多个,000 linear feet of water main and over 2,000linear feet of sewer main with all associated appurtenances including backflow preventers,米, 热箱, 阀门,人孔, 等. 该项目还包括设计一个微型筛选设施,以便在将废水排放到洛斯鲁纳斯村下水道系统之前对其进行预处理. The project also included the design and construction of an altitude control valve at the existing water tanks. The project also included the design of yard piping to utilize the existing water tanks on site. Substantial coordination was required with the Village of Los Lunas, 新墨西哥州的修正, and the 新墨西哥 Property Control Division.

古巴公立学校水环线

该项目包括为古巴公立学校规划和设计一个新的8英寸水圈,以改善高中的消防流量和压力, 中学, and Elementary School Buildings at the Cuba Public School’s Campus. 新的水环的设计是为了改善家庭服务和消防流量,通过环绕校园的水环,并连接到一条新的8英寸的线,从古巴村的储水罐. This project included extensive coordination with the Village of Cuba, 州消防局长办公室, the Cuba Public Schools and the School’s Architect. 除了8英寸的水环, the project also included the installation of new fire hydrants and valving throughout the system.

Tierra Amarilla高中 & Elementary School 水 System Improvement

该项目包括规划和设计2600英尺的6英寸总水管,从市政系统到新的75,000 gallon storage tank located at the high school. The storage tank as sized for both domestic and fire flow demand for both facilities. 两个设施还包括一个增压泵站的设计,能够提供两个结构的家庭和消防流量需求. lovebet爱博体育app还设计了2600英尺的8英寸水线,将新的水箱连接到小学增压泵站. This project included extensive coordination with 州消防局长办公室, 校区, 以及学校的建筑师.

Chilili Affordable Housing Preliminary 工程 Report

lovebet爱博体育app为奇利利土地赠款社区的经济适用房发展进行了全面的PER .The scope of the study included the development of several alternative subdivision layouts, an evaluation of the existing water system, an evaluation of roadway infrastructure, and an evaluation of the drainage infrastructure. lovebet爱博体育app还对该项目的液体废物收集方案进行了评估,包括化粪池, 中央集, 包装废水处理, 废水蒸发泻湖.

石质的,圣. Chad’s Episcopal Church, County of Santa Fe, 新墨西哥

lovebet爱博体育app对位于圣达菲县的斯通尼营设施的几种废水处理方案进行了初步研究. 由于监测井的硝酸盐检测呈阳性,国家医疗卫生管理局发布了移除和更换化粪池的合规命令. 这项研究包括对几种污水处理方案的评估,包括白水蒸发泻湖, 低压分散场, 和包装处理设施. 该项目还包括评估泵站和集中收集两个现有化粪池位置的废水. 这项工作包括与NMED地下水饮用局进行广泛的协调和会议,以评估所考虑的替代方案.

Northern 新墨西哥 Wood Business Park Waste 水 ARRA Project

This project was funded as a part of the American Reinvestment & Recovery Act (ARRA)Federally Funded 项目. 该项目包括对位于拉斯维加斯的北新墨西哥州木材商业园区(NNMWBP)的废水收集和处理设施进行综合研究和设计, 新墨西哥.这350000美元.00 project included the design of gravity sewer collection system, 污水提升站, 力电源, and a series of waste water evaporative lagoons. The project also included close coordination with the NMED regarding the design of the facility, 排放许可, and the installation of groundwater monitoring wells on the project.

City of Moriarty Sewer Extension Project

Mr. 米勒计划和设计了超过2英里的10英寸和12英寸的重力下水道从城市现有的下水道系统向西延伸. 这项工程包括在旧66号公路下钻探和套管三条污水管道,为公路两侧提供服务. Substantial coordination with the NMSHTD on easement acquisition,和许可, for the construction of the sewer line within NMSHTD right-of-way was required. 该项目还包括评估来自新服务区的潜在流量,以及对城市现有污水截流器和污水处理设施的潜在影响.

Escalante High School Waste 水 Lagoon Project

lovebet爱博体育app completed the design of a central waste water collection system, 废水抽水站, 1500线性英尺的强制主管道, a large wastewater evaporative lagoon, 以及监测井的安装. This effort included coordination with the NMED on the design of the system, 系统的批准, and compliance with their discharge permit.

Window Rock Teacher Housing Units, Navajo Nation, Arizona

This project included the development of two teacher housing communities in the Window Rock area. Sanitary sewer utilities, water utilities,and a 评分/排水 plan were developed for each site. 每个地点都需要与纳瓦霍部落公用事业管理局(Navajo Tribal Utility Authority)进行道路设计和协调,以提供lovebet爱博体育app设施和水设施. One of the two sites also included the design of a sanitary sewer lift station.

Window Rock 中学 Improvements – Fort Defiance, AZ

该项目包括对现有中学校园的改进设计,包括新建筑的增加, 停车区域, 公共汽车环线道路, 评分/排水,and associated utility (sewer/water) improvements.作为效用改进的一部分, the project included design of a new 220,000 gallon water storage tank and pumping station to supply both domestic water and fire suppression. 为满足该设施的生活和消防流量要求,设计了大约3000 LF的水管, including all appurtenances such as hydrants, 发布指示阀门, 闸阀, 等.

科奇提湖污水系统研究 & Conceptual Design, Cochiti Lake, 新墨西哥

lovebet爱博体育app conducted a study phase and conceptual design for approximately 5.5 miles of sanitary sewer gravity main located within the Village of Cochiti Lake, 新墨西哥. 该项目诱导了对所有下水道主管道的全面摄像工作,并对摄像镜头进行评估,以确定项目范围内下水道主管道所有部分的状况. 该项目的研究阶段包括评估几种施工方案,以解决污水管道的不足部分,包括明沟和无沟技术,如滑衬 & 国内. lovebet爱博体育app prepared conceptual design drawings which included a combination of open trench,pipe bursting and manhole rehabilitation. 概念设计是工程师对可能的建筑成本提出意见的基础, which will be used to seek funding for the construction of the project.

石质的,圣. Chad’s Episcopal Church, County of Santa Fe, 新墨西哥

lovebet爱博体育app对位于圣达菲县的斯通尼营地的几种废水处理方案进行了初步研究. 由于监测井的硝酸盐检测呈阳性,NMED发布了移除和更换化粪池的合规命令. The study included an evaluation of several wastewater treatment alternatives including a lagoons system, 低压分散场, 和包装处理设施. 该项目还包括评估泵站和集中收集两个现有化粪池位置的废水. 这项工作包括与NMED地下水饮用局进行广泛的协调和会议,以评估所考虑的替代方案

Address

3500年科曼奇族不
建筑F
87107年阿尔伯克基纳米

打电话给我们

办公室: 505.888.7500

传真:505.888.3800